Capsule Station Kmart Centre
Pocket-sized fun meets proper form and function.
Project Detail
Type: Commercial
Design: Arkim
Builder: Arkim
Year: 2022
Location: Kmart Centre 11/222 Little Bourke St, Melbourne VIC 3000
D-Framework Process
D-Frameworks takes a holistic approach in terms of design and fabrication. Our innovative system fast-tracks the whole construction process, allowing our commercial clients such as Capsule Station to launch their operations as soon as possible.
Concept
Working with a small space meant that every millimeter counts. The concept relied on maximising every part of the retail space in order to fit as many capsule machines as possible. However, this is not a challenge with D-Frameworks. Through our technology, we delivered cost-efficient yet precise frameworks for them.
Segmented Modules in BIM
BIM revolutionizes the way we approach construction projects, providing a comprehensive tool that combines design, planning, and collaboration to deliver outstanding outcomes. By integrating this to our process, we empower our clients to effectively manage their budgetary constraints throughout the entire project life-cycle.
Assembling the D-Frameworks on Site
Finished Output
Small space, big in details
Maximising space for maximised fun!
Discuss your next commercial project with us →